Overview
Lobbying Costs
50,000€ - 99,999€
Financial year: Jan 2022 - Dec 2022
Lobbyists (Full time equivalent)
0.75 Fte (2)
Lobbyists with EP accreditation
0
High-level Commission meetings
1
Lobbying Costs over the years
-
Info
Polskie Sieci Elektroenergetyczne S.A. (PSE)
EU Transparency Register
173878549833-26 First registered on 17 Apr 2023
Goals / Remit
The subject of PSE activity is to provide the services of electricity transmission in compliance with the required criteria of the security of the Polish Power System operation. The main objectives of the PSE activity are:
providing electricity transmission services and ensuring secure and cost-effective operation of the Polish Power System whilst meeting the conditions of synchronous operation with other European systems,
ensuring the necessary development of the domestic transmission grid and cross-border interconnections,
making transmission capacity available on market based methods for cross-border exchange purposes,
creating the technical infrastructure for the operation of the domestic wholesale electricity market.
PSE is the owner and operator of 295 extra high voltage lines (220 and 400 kV) with a total length of 15,693 km, as well as 110 extra high voltage substations.Main EU files targeted
Regulation 2019/943 on the internal market in electricity
Directive 2019/944 on common rules for the internal market in electricity
Regulation 2011/1227 on wholesale market integrity and transparency
Directive 2018/2001 on renewable energy sources
Regulation 517/2014 on fluorinated greenhouse gases (F-gases)
Regulation 2022/869 on Trans European Networks (TEN-E)
Network CodesAddress
Head Office
ul. Warszawska 165
Konstancin-Jeziorna 05-520
POLANDEU Office
ul. Warszawska 165
Konstancin-Jeziorna 05-520
POLANDWebsite
-
People
Total lobbyists declared
2
Employment time Lobbyists 50% 1 25% 1 Lobbyists (Full time equivalent)
0.75
Lobbyists with EP accreditation
No lobbyists with EP accreditations
Complementary Information
None declared
Person in charge of EU relations
Data not provided by Register Secretariat due to GDPR
Person with legal responsibility
Data not provided by Register Secretariat due to GDPR
-
Categories
Category
Companies & groups
-
Networking
Affiliation
European Network of Transmission System Operators fo electricity (ENTSO-E)
Conseil International des Grands Reseaux Electriques (CIGRE)
Central Europe Energy Partners (CEEP)
European Energy Information Sharing and Analysis Centre (EE-ISAC)Member organisations
None declared
-
Financial Data
Interests represented
Promotes their own interests or the collective interests of their members
Closed financial year
Jan 2022 - Dec 2022
Lobbying costs for closed financial year
50,000€ - 99,999€
Major contributions in closed year
Type Name Amount Grant CEF 37,509,772€ Grant HORIZON2020 13,770€ Intermediaries for closed year
None declaredIntermediaries for current year
None declaredClosed year Costs
50,000€ - 99,999€
Other financial info
PSE received in 2022 the sources for the construction of the new electricity infrastructure from following EU funds:
CEF – Connecting Europe Facility: 37 509 771,75 EUR
POIiŚ 2014-2020 Operational Programme Infrastructure and Environment: 73 854 531,21 EUR
HORIZON2020: 13 769,73 EUR
-
EU Structures
Groups (European Commission)
none
Groups (European Parliament)
N/A
Communication activities
n/a
Other activities
None declared
- Meetings
Meetings
1 meetings found. Download meetings
The list below only covers meetings held since November 2014 with commissioners, their cabinet members or directors-general at the European Commission; other lobby meetings with lower-level staff may have taken place, but the European Commission doesn't proactively publish information about these meetings. For more information about which commissioner is responsible for which portfolio, check out this link: https://commissioners.ec.europa.eu/index_en All information below comes from European Commission web pages.
-
Date 06 Sep 2023 Location Brussels Subject High level dinner before the ENSTO-E grids event – discussion on the challenges for European networks and electrification. Cabinet Cabinet of Commissioner Kadri Simson Portfolio Energy Attending - Stefano Grassi (Cabinet member)
- Kadri Simson (Commissioner)
Other Lobbyists - Amprion GmbH
- Statnett SF
- Fingrid Oyj
- Redeia
- Hitachi Energy
- NKT A/S
- Eesti Energia Aktsiaselts
- European Association of the Electricity Transmission and Distribution Equipment and Services Industry
- European Network of Transmission System Operators for Electricity
- Associazione fra le società italiane per azioni
- Terna spa
- Renewables Grid Initiative e.V.
- Energias de Portugal
- RTE Réseau de transport d'électricité
- TenneT Holding B.V.
- ENEL SpA
- E.ON SE
- IBERDROLA
- Siemens Energy AG
- PRYSMIAN GROUP
- Meetings